OS Board
← Product HouseComing 2027 · Concept
THE FACILITY VIEW OF YOUR OPERATION

A building.
Many tasks.
A connection.

OS Facility is intended to connect systems, medical technology, orders, maintenance, cleaning, personnel as well as areas and tenants. On a common database with OS Board. From the event to the confirmed completion.

Explore concept

Scheduled for 2027. OSF is in the concept phase. The following views show the target image; The scope of functions and introduction will be fleshed out step by step.

Tickets & Orders
ROOM → FACILITY → ORDERCONCEPT VISUALIZATION
CARE & WARDOS Board OS FacilityTECHNOLOGY · CLEANING · FM
THE PLANNED INTERACTION

What happens
if something happens?

Three examples show how OSF should translate events into tasks and feedback in the future.

The stay ends.
The next step begins.

An escape should trigger bed preparation. OSF should consider room rules and next expected entry. Only once the cleaning has been confirmed will the bed be released again.

TRIGGER Exit from KIS / OS Journey
  1. 01Event
  2. 02Order
  3. 03Version
  4. 04Feedback
PLANNED PROCEDURE · 01 / 04

Exit reported

OS Board receives the exit from the KIS or the digital check-out.

FEEDBACK / ROOM 204Cleaning requiredConcept example with sample data

Step 1 of 4 · Exit reported

EIGHT PLANNED CORE MODULES

The whole company.
In context.

Technical, infrastructural and commercial facility management. The modules should be able to be introduced individually and according to your priorities.

01
TECHNICAL FM

Assets & Lifecycle

A system file should combine master data, technical assignment, condition, malfunctions, costs and history. End-of-life and replacement planning should make the next few years visible.

02
MEDICAL TECHNOLOGY

Medical technology

Device files, inspection intervals, instructions, location and loan are planned as a separate module. Medical devices should use the same order, document and evidence logic as technical systems.

03
TECHNICAL FM

Tickets & Orders

Reports should become orders with priority, responsibility and deadline. Check-in, working hours and materials should be recorded on the order; Executors and clients should confirm the completion.

04
TECHNICAL FM

Maintenance & Contracts

The existing contract management should be connected to systems, rooms and service providers. Maintenance plans are intended to trigger orders; Contract deadlines, documents and reminders remain visible together.

05
TECHNICAL FM

Operator obligations

A catalog of duties defined together with facility management should bring together checks, due dates and evidence. Defects should result in follow-up orders.

06
INFRASTRUCTURAL FM

Cleaning & Housekeeping

Planned areas and tours should interact with events such as departures or special clean-ups. Checklists and time recording are designed for mobile processing.

07
STAFF

Personnel & operational planning

Teams, qualifications, presence, on-call and substitution should control the distribution of orders. The existing roster remains leading; OSF is intended to make capacity and working time visible on the order.

08
COMMERCIAL FM

Spaces & tenants

Rooms, areas, usage, rental properties and contract periods should use the same structure. Planned exports connect this information to the existing ERP.

A COMMON BASIS

Same room.
Two perspectives.

Room 204 is a patient room with beds on the ward. In OSF, the same data set should also connect areas, facilities, contracts and cleaning areas.

OS Board

Care & Ward

Patient, case, bed and ward status. OSF is intended to build on the existing structure, roles and events of OS Board.

Discover OS Board ↗
EventStatus
OS Facility

Facility management

Additional levels are planned for buildings and floors, all room types, technical systems and the associated tasks.

Coming 2027

At the task location.

Report in three steps: Where, What, Photo. Role-related views are planned on the OS Panel, in the OSF app and on the handset. Badge or NFC should assign the person and place.

In your infrastructure.

The concept envisages operation in the customer network, with your own clients, roles and SSO. Existing systems should remain connected via interfaces.

With your alarm system.

A planned alarm adapter should connect orders, escalations and confirmations to the existing alarm system. OS Alarming, Ascom handsets, DECT, pager and app are provided as channels; The connection is implemented per system.

With clear distribution of tasks.

Accounting, purchasing, HR and wages remain in the existing systems. OSF is intended to plan operations and record working hours on the order. BIM modeling remains in the specialist system; CAD import is planned for a later expansion stage.

OTHER PLANNED MODULES

Expand gradually.

Additional CAFM areas are planned as individually insertable extensions. The scope, sequence and connections are determined in the joint project.

  • Keys & locking systems
  • Storage & Material
  • Room & resource booking
  • Vehicle fleet
  • Energy & Consumption
  • Moving & Occupancy
  • Projects & measures
  • Floor plans & CAD
OUTLOOK 2027

Step by step.
With your company.

The planned path leads from the joint workshop to the pilot operation. The existing CAFM remains the leader for areas not yet adopted. The order and scope are determined in the project.

  1. 01

    Concept & Workshop

    Define use cases, database and limits together.

  2. 02

    Pilot & feedback

    Start cleaning and reporting; Check everyday processes.

  3. 03

    Modules & expansion

    Gradually add facilities, medical technology, personnel and duties as well as areas, tenants and expansion modules.

THE NEXT STEP BEGINS WITH A CONVERSATION.OS BOARD / PRODUCTS HOUSE

What do you have
in mind?

An idea, a challenge, a concrete project.
We listen and think along.

[email protected] +41 58 255 09 00
OS BOARD / ADVICE FROM NEUTRONIX

Let's talk.

Tell us about your project.

We will open your request as a draft in your email program. You check and send the message yourself.

Would you rather go straight? [email protected]